Phase [A]
Subframe positioned.
Phase [B]
Brick and blockwork around subframe.
Phase [C]
Blockwork stepped at opening height for lintel location.
Phase [D]
Lintel located over subframe guide locator and supported on stepped blockwork.
Phase [E]
Brick and blockwork complete around lintel, subframe and electrical first fix.
Phase [F]
Removal of timber supports and installations of window/door frame.
Phase [G]
Installation of roller shutter brackerty and roller shutter.
Phase [H]
Installation of insulation.
Phase [I]
Internal plastering and soffit board installation plus removable access panel.
Phase [J]
Check on mechanical settings.
Phase [K]
External view of shutter full open.
Phase [L]
External view of shutter fully lowered.